Finalize production and upload materials by January 25th—ensure all content is prepared for distribution.
Final Deliverables
Deadline: Complete by January 25th
Objective: Finalize all creative production work and upload final approved materials to SayPro’s internal and/or external distribution platforms.
Task Description:
The final deliverables phase ensures that all approved creative materials are fully produced, properly formatted, and uploaded to the necessary channels for distribution. This includes both internal use (for archiving, internal communications, or further approvals) and external publishing (for social media, print vendors, email platforms, etc.).
Steps to Complete the Task
1. Final Production of Materials (By January 22nd)
- Double-Check All Revisions Are Complete: Review all previous feedback and ensure every revision has been addressed and approved.
- Finalize Formats:
- Print Materials: Ensure high-resolution, CMYK, bleed-included files (e.g., .PDF, .EPS).
- Digital Assets: Web-optimized versions (e.g., .PNG, .JPG, .MP4, .GIF).
- Editable Files: Store and label source files (e.g., .PSD, .AI, .INDD) for future updates.
- Check Platform Specs: Confirm size and format requirements for each distribution channel (e.g., Facebook image ratios, email banner sizes, etc.).
- Proof for Errors: Conduct a final round of QA to ensure there are no typos, broken links, or visual inconsistencies.
2. Organize Deliverables for Upload (By January 23rd)
- Folder Structure: Use a clear folder system (e.g., CampaignName > Final Assets > Print / Web / Social).
- Naming Conventions: Apply consistent and descriptive file names (e.g., SayPro_QuarterlyAd_Facebook_vFinal.jpg).
- Checklist of Files: Prepare a master checklist to verify that all required assets have been included.
3. Upload to Internal Systems (By January 24th)
- SayPro Internal Repository: Upload all final versions to the designated location on SayPro’s internal server, shared drive (e.g., Google Drive, SharePoint), or asset management system.
- Tag & Categorize: Label assets for easy search (e.g., campaign type, quarter, platform).
- Notify Teams: Inform relevant departments (Marketing, Communications, Social Media) that the files are ready and available.
4. Upload to External Platforms (By January 25th)
- Social Media: Prepare and upload materials to scheduling tools (e.g., Buffer, Hootsuite, Meta Business Suite).
- Email Platforms: Upload assets to Mailchimp, Sendinblue, or whichever email tool is used.
- Print Vendors: Share production-ready files with external printers or partners, confirming print specs and delivery timelines.
- SayPro Website or Portal: Publish or schedule approved content on SayPro’s website or employee intranet as applicable.
Final Deliverables Should Include:
- Final Creative Files (Print & Digital)
- Editable Source Files (For archiving)
- Proof of Approvals (PDF or email confirmations)
- Upload Confirmations (Screenshots or system logs showing that assets have been successfully uploaded)
- Final Deliverables Checklist (Marked complete and shared with project leads)
Goal:
To have all content fully approved, correctly formatted, and officially uploaded or published by January 25th, ensuring a smooth and professional transition from production to public release or distribution.